Capability
Condenser Tube Cleaning
Pull back condenser backpressure and recover the megawatts fouling has been quietly costing you.
A fouled condenser is one of the most expensive problems in a plant precisely because it is invisible until you look at the heat rate. We clean full condenser bundles inside the outage window, and where the schedule allows, verify tube condition with eddy current in the same access.
-
Full-bundle coverage
Every tube cleaned and accounted for, not a representative sample.
-
Metallurgy-matched methods
Titanium, stainless, copper-nickel and admiralty brass each get a different approach.
-
Integrated NDT
Eddy current examination while the waterbox is already open — one access, one mobilisation.
-
Tube plugging
Failed tubes identified, plugged and recorded against the tube map before close-up.
Outage support
Need condenser tube cleaning
in your next outage?
Scoping call within 24 hours. Crews mobilised worldwide.